| سال | هفته | ID | Title | ApplNo | IPC | Applicant | Subgroup | زیر گروه | رشته | شرح | Description |
|---|
2025 | 49 | WO/2025/247920 | CONCRETING SYSTEM FOR PRODUCING PREFABRICATED CONCRETE PARTS, AND METHOD FOR OPERATING A CONCRETING SYSTEM | EP2025/064678 | B28B 13/02 | PUTZMEISTER ENGINEERING GMBH | PERFORMING OPERATIONS; TRANSPORTING | انجام عملیات؛ حمل و نقل | شکل دهی | 2025 | 49 | WO/2025/247960 | CONCRETING SYSTEM FOR PRODUCING PREFABRICATED CONCRETE PARTS AND METHOD FOR OPERATING A CONCRETING SYSTEM | EP2025/064763 | B28B 13/02 | PUTZMEISTER ENGINEERING GMBH | PERFORMING OPERATIONS; TRANSPORTING | انجام عملیات؛ حمل و نقل | شکل دهی | 2025 | 49 | WO/2025/249348 | DISCHARGE POSITION CONTROL SYSTEM FOR FLYING 3D PRINTER FOR CONSTRUCTION | JP2025/018859 | B28B 1/30 | AIZAWA CONCRETE CORPORATION | PERFORMING OPERATIONS; TRANSPORTING | انجام عملیات؛ حمل و نقل | شکل دهی |